We executed a complete 40 kW solar power installation at the Namakkal Court Building in Paramathy, delivering a turnkey solar solution covering system design, equipment supply, installation, testing, commissioning, and centralized performance monitoring.
Designed to serve the building’s consistent daytime power needs, the system includes 79 high-efficiency Novasis 550 Wp monocrystalline panels. It is estimated to generate over 60,000 units (kWh) annually, contributing to significant savings on electricity bills while reducing the building’s carbon footprint.
The grid-tied solar setup integrates seamlessly with the existing electrical infrastructure and features smart monitoring tools for real-time performance tracking. This project supports the Tamil Nadu government’s mission to transition public buildings to sustainable, energy-efficient systems.
Our team ensured smooth execution from load assessment to final integration, minimizing disruption to daily court operations and ensuring long-term energy resilience for the facility.
Installed Capacity
Novasis 550 Wp Monocrystalline
Year Commissioned
Project Budget
This 40 kW solar installation meets the growing energy needs of mid-sized government facilities like the Paramathy court. The solution delivers cost savings, enhanced energy efficiency, and supports environmental sustainability goals. Our expert design and smart monitoring tools ensure consistent power generation and low operating costs.
By reducing dependency on the grid and lowering operational expenses, this system empowers public institutions to adopt clean energy without compromising performance or reliability.
Prior to this installation, the Paramathy court building was entirely reliant on conventional grid electricity, leading to high recurring energy costs and limited power reliability. The building lacked any form of renewable energy utilization, even though it had ample rooftop space suitable for solar generation. The absence of monitoring systems made it difficult to track or manage power consumption effectively. In line with Tamil Nadu’s push for green infrastructure, the need for a clean, cost-efficient, and maintenance-friendly solar power system became critical. This 40 kW grid-tied solution was implemented to resolve those challenges—ensuring energy savings, improved reliability, and environmental responsibility in the court’s daily operations.